Rapid Rail targets 200,000 LRT users daily on Ampang-Sri Petaling Line by end-2024
“Simultaneously with the reopening of the route between the two stations, the frequency of trains at peak times returned to normal with a waiting time of three minutes for the central business district (CBD) and six minutes outside the CBD with the operation of 37 trains.