WCT Holdings bags RM840 mil LRT3 works
KUALA LUMPUR (Aug 30): WCT Holdings Bhd has bagged a contract worth RM840 million for the construction and completion works relating to the light rail transit Line 3 (LRT3) from Bandar Utama to Johan Setia.
KUALA LUMPUR (Aug 30): WCT Holdings Bhd has bagged a contract worth RM840 million for the construction and completion works relating to the light rail transit Line 3 (LRT3) from Bandar Utama to Johan Setia.
KUALA LUMPUR (April 5): WCT Holdings Bhd has bagged a contract from Prasarana Malaysia Bhd for work packages related to construction of the Light Rail Transit Line 3 from Bandar Utama to Johan Setia, worth about RM185.
KUALA LUMPUR (April 4): Mudajaya Group Bhd has bagged a RM58.
KUALA LUMPUR (May 12): The proposed alignment of the Light Rail Transit Line 3 (LRT3) will terminate at Johan Setia in Klang, which is the proposed location for the last station that will be the main depot for the railway scheme, said group managing director of Prasarana Malaysia Bhd Azmi Abdul Aziz (pictured) today at a media conference announcing the public inspection for the LRT3 railway scheme.