Public feedback sought for MRT3 project

MRT3 — currently still in the planning stages — will be the final piece of the Klang Valley Mass Rapid Transit (KVMRT) network that will run along the perimeter of Kuala Lumpur, integrating with existing MRT, LRT, KTM, and Monorail lines through 10 interchange and connecting stations.

READ MORE

Geotechnical study for planning permission applications of all KL buildings an overkill, says expert

Dexter Koh, deputy president, Malaysian Institute of Architect: “I don’t think all projects should be halted and I sense this as a knee-jerk reaction to the problem,” KUALA LUMPUR (Aug 30): The suspension of new construction approvals in the city and the requirement for all projects to comply with geotechnical reports is an “overkill”, said Dexter Koh, deputy president, Malaysian Institute of Architects.

READ MORE