Radium Development completes RM40,000 CSR upgrading works for Shelter Home for Children OUG

Some 15 volunteers took about a month to complete a series of upgrading works for Shelter Home for Children, such as levelling and installing a concrete floor in the 1,200 sq ft car porch area; repairing ground floor window grilles and adding new mosquito nettings; installing new door frames in the indoor kitchen counter and sink area; installing a lockable grille door in the outdoor kitchen counter; and patching up a section of an interior wall that was previously exposed brick.

READ MORE