MBPJ checks on 'funeral parlour'

PETALING JAYA (June 2): The Petaling Jaya City Council (MBPJ) recently swooped in on a shop in Section 22 here after residents made numerous complaints that it was illegally being operated as a funeral parlour.

READ MORE

Even sans HSR, Bandar Malaysia retains its allure

PETALING JAYA (June 2): The 486-acre Bandar Malaysia development in Sungai Besi, which was to house the terminus of the recently-stopped Kuala Lumpur-Singapore high-speed rail (HSR) line, is still attractive thanks to its strategic location and two future mass rapid transit (MRT) stations coming up there, reported The Edge weekly.

READ MORE

ECRL cost inflated, says finance minister

PETALING JAYA (June 2): The cost of the East Coast Rail Link (ECRL) – which is one of several mega projects being reviewed by the Pakatan Harapan government – has been inflated, said Finance Minister Lim Guan Eng.

READ MORE

Exchange 106 required MoF fund injection, says finance minister

PETALING JAYA (June 2): The development of The Exchange 106 (formerly known as Signature Tower) in the Tun Razak Exchange (TRX) international financial district required financing from the Ministry of Finance (MoF), which was not reflective of the 49:51 shareholding structure of the project between the ministry – via its unit MKD Signature Sdn Bhd - and Indonesia’s Mulia Group.

READ MORE

Singapore seeks clarification on HSR project

  SINGAPORE (June 1): Singapore has requested the Malaysian government to clarify its position on the Kuala Lumpur-Singapore high-speed rail (HSR) project, Bernama reported Minister for Transport Khaw Boon Wan as saying.

READ MORE