LFE Corp secures contracts worth RM71m for Oasis Ara, Cyberjaya development
The scope includes the design and build of underpinning and structural strengthening works, and the demolition and reconstruction of a ramp and associated works.
The scope includes the design and build of underpinning and structural strengthening works, and the demolition and reconstruction of a ramp and associated works.
The group's domestic operations have gained significant momentum, with orders now contributing 41% of the overall RM35 billion construction order book, up from 28% last year.
The stronger earnings were mainly driven by the RM402.
Homes have evolved from being just a shelter within four walls.
CCC-ECRL confirmed that it had received the notice of adjudication from the Advancecon subsidiary, Advancecon Infra Sdn Bhd, which alleged outstanding payments for subgrade, drainage, and culvert works carried out under two sub-contract for the ECRL project.
The project, located at Lot 104295, Jalan Tiara in Taman Mutiara Bukit Jalil, was awarded by Sunway Flora Sdn Bhd.
“Hopefully, it would be part of the Pan Asian [Railway] (from Kunming, China, to Singapore).
"The first EMU (electric multiple unit) needs to undergo 8,000km of testing, while the subsequent batch requires 5,000km of testing.
Lim is succeeded by Fong Tuck Yong, 52, effective June 20.
In a filing with Bursa Malaysia on Thursday, the civil engineering group said its wholly owned subsidiary, Advancecon Infra Sdn Bhd, is seeking RM15.