No casualties in Tropicana Gardens fire at Kota Damansara (Update)
PETALING JAYA (Nov 13): The fire at the mixed-use Tropicana Gardens construction site in Kota Damansara was contained within an hour of its breaking out at 2.
PETALING JAYA (Nov 13): The fire at the mixed-use Tropicana Gardens construction site in Kota Damansara was contained within an hour of its breaking out at 2.
KUALA LUMPUR (Nov 13): IJM Corp Bhd has won a RM378 million design-and-build contract for a corporate office tower in Damansara Uptown.
PUTRAJAYA (Nov 13): The slow market absorption has led to an increase in residential overhang of 20,867 units worth RM12.
KUALA LUMPUR (Nov 13): Trive Property Group Bhd signed a joint venture agreement (JVA) with Jiangxi Fujing New Energy Technology Co Ltd for a planned collaboration in the manufacturing and sale of solar energy products.
成交价:RM300,000 交易推手:来自1TPE Realty Sdn Bhd的Wong Hor Yan (REN 18777,016-324 8307) 成交日:2017年6月 卖点: 有期地契 土地面积:825平方尺 邻近便利设施包括便利商店、餐厅、超市、诊所、汽车维修中心、医院、银行以及Tesco霸级市场 交通四通八达,可取道Damansara-Puchong Expressway出入 位于雪州Puchong的Taman Sri Puchong,是个具有19年历史的有期地契项目,当中包含了排屋、公寓及商铺。 发展已臻成熟的Taman Sri Puchong靠近Damansara-Puchong Expressway及多项便利设施,如便利商店、餐厅、超市、诊所、汽车维修中心、医院、银行及Tesco霸级市场。 根据促成这宗交易的Wong Hor Yan,业主于2014年在拍卖会以RM170,000购下这间房子,当时计划作为投资。 如今,这宗交易以RM300,000成交,业主如愿以偿以一个好价钱把该房子卖给一名有意买来自住的买家。 “在同一地区的类似房屋,售价平均为RM270,000,这种交易的成交价高于目前市价水平,不过,这个价位的房子在Puchong地区依然相当受欢迎,因为仍算可负担水平,”她说。 根据EdgeProp.
The grande dame of Malaysian roads — Old Klang Road or Jalan Klang Lama — has maintained its vitality, not just as an arterial road in Kuala Lumpur city but also as a property hotspot.
KUALA LUMPUR (Nov 10): Trive Property Group Bhd said a contract awarded to the group in 2014 under the People's Housing Programme (PPR) has been mutually terminated.
RAWANG (Nov 11): Mah Sing Group Bhd will be rolling out its third township project in Rawang, Selangor called M Aruna in the first quarter of 2018.
KUALA LUMPUR (Nov 10): Construction and property developer Zecon Bhd, whose net debt widened 50.
KUALA LUMPUR (Nov 10): Financing is the key consideration for the Mass Rapid Transit Corp Sdn Bhd concerning the construction of the mass rail transit line 3 (MRT3), where the criteria for its lead contractor have been said to be out of reach of local players.