MBAM launches new headquarters in Putra Heights
Completed and occupied on June 16, 2025, the building spans 17,646 sq ft and is now fully utilised as a hub for mediation, training and fellowship.
Completed and occupied on June 16, 2025, the building spans 17,646 sq ft and is now fully utilised as a hub for mediation, training and fellowship.
It is the fifth data-centre related contract win for the mechanical and electrical engineering services group since its listing in January this year.
Bagan member of Parliament Lim Guan Eng: Penang, which lacks natural resources, needs a fresh economic driver to maintain its momentum and advance further.
The airport operator said the latest disruption was "disappointing" given that the aerotrain system had undergone a stringent testing, commissioning, and certification process prior to its launch.
Bayu Serenia forms part of ongoing development within Serenia City, a major township in the southern Klang Valley corridor envisioned as the “Garden City of KLIA”, featuring residential, commercial, and industrial precincts focused on liveability, sustainability, and connectivity.
Transport Minister Anthony Loke Siew Fook: Even though MAHB is a government-linked company, it is still subject to our licensing regulations.
The contract, awarded to its wholly-owned subsidiary Crest Builder Sdn Bhd, encompasses reinforced concrete construction up to Level 6 for three blocks of service apartments and a six-storey podium.
Designated as Package CMC2, the tender is open to Malaysian contractors as well as foreign contractors, which must form a joint venture or consortium with Malaysian contractors holding at least 50% equity.
The new Wisma KePKAS, with an estimated development cost of RM70 million, will be located at Jalan Wisma Budaya, on a site measuring approximately 1.
Ibtec is a 7,290-acre master-planned township envisioned as Southeast Asia’s first circular city, integrating advanced industries with low-carbon, sustainable living.