DBKL cancels PPR, public housing repainting contracts
KUALA LUMPUR (May 31): The contracts of 10 firms appointed to repaint Public Housing and People's Housing Project (PPR) buildings in Kuala Lumpur costing RM180 million have been cancelled, reported Bernama yesterday.
Tun M on HSR: RM100bn outlay for 100,000 jobs inefficient
PETALING JAYA (May 31): Prime Minister Tun Dr Mahathir Mohamad has fired back at former premier Datuk Seri Najib Razak, saying that an investment of up to RM100 billion to create 100,000 jobs is “not very efficient”.
KL car clamping to resume tomorrow
PETALING JAYA (May 30): Kuala Lumpur City Hall (DBKL) will resume clamping cars that are parked haphazardly in critical parts of the city, a mere two days after it was announced that the enforcement practice will be suspended.
KL MPs hope to retrieve 10 of the 64 dubious DBKL land plots sold
PETALING JAYA (May 30): Kuala Lumpur MPs hope to retrieve at least 10 plots of land that are still registered under the name of the Kuala Lumpur City Hall (DBKL) in the 64 parcels of land sold by DBKL under the purview of the former Federal Territories Minister Datuk Seri Tengku Adnan Tengku Mansor from 2013 to 2018.
PM's unilateral scrapping of HSR came as a surprise, raises concern, says report
KUALA LUMPUR (May 30): Prime Minister Tun Dr Mahathir Mohamad's move to scrap the Kuala Lumpur-Singapore high-speed rail (HSR) mega project came as a surprise to many and the fact that he did not consult the cabinet has raised concern, Malaysiakini reported today.
Back up your HSR RM209b loss claims, PM tells ex-minister
PETALING JAYA (May 30): Prime Minister Tun Dr Mahathir Mohamad has challenged former Minister Datuk Abdul Rahman Dahlan to back up his claims that the cancellation of the Kuala Lumpur-Singapore high-speed rail (HSR) will result in economic losses of RM209 billion.
Teresa Kok slams accusations of ignoring Taman Desa group as “baseless”
PETALING JAYA (May 28): Seputeh MP Teresa Kok has refuted accusations by the Protect Taman Desa coalition that she had ignored them as “baseless and wholly untenable”.
Bina Puri to raise up to RM29.8m via private placement
KUALA LUMPUR (May 25): Bina Puri Holdings Bhd has proposed to raise up to RM29.
No sign of Taman Rimba Kiara construction
PETALING JAYA (May 24): The construction of a sales gallery on the much talked about development on Taman Rimba Kiara at Taman Tun Dr Ismail (TTDI) has not begun since the land was cleared a few months ago.