重点报道:Khalid Samad的烫手山芋
甫上任两周,新任联邦直辖区部长Khalid Samad一刻不得闲,因为早在他被委任之前,就有一箩筐的问题有待他处理。 在他满满的行程中,EdgeProp.
甫上任两周,新任联邦直辖区部长Khalid Samad一刻不得闲,因为早在他被委任之前,就有一箩筐的问题有待他处理。 在他满满的行程中,EdgeProp.
KUALA LUMPUR (July 26): It will now be a scaled down LRT3.
SHAH ALAM (July 25): A briefing was conducted on the new Shah Alam individual quit-rent during a seminar attended by joint management bodies (JMB) and management committees of stratified buildings in Shah Alam.
PETALING JAYA (July 24): The LRT3 line is to run through the only green lung in the area, and Jalan Plumbum 101 and 103 residents in Section 7 Shah Alam are worried.
KUALA LUMPUR (July 24): Property developer I-Bhd's net profit rose 5.
Just two weeks ago, Khalid Samad was sworn in as Federal Territories (FT) Minister, but he is already feeling the heat as a profuse number of unresolved issues await his decision and instructions.
PETALING JAYA (July 20): Bukit Bayu residents are worried about activities in the forest near them, after hearing what sounded like an explosion in the area.
SCROLL DOWN FOR VIDEO PETALING JAYA (July 18): Videos of a rat running wild in the bakery of a hypermarket in Shah Alam has gone viral, forcing the place to shut down for a thorough cleansing.
KUALA LUMPUR (July 18): Advancecon Holdings Bhd has bagged its second earthworks contract worth RM20.