Back up your HSR RM209b loss claims, PM tells ex-minister

PETALING JAYA (May 30): Prime Minister Tun Dr Mahathir Mohamad has challenged former Minister Datuk Abdul Rahman Dahlan to back up his claims that the cancellation of the Kuala Lumpur-Singapore high-speed rail (HSR) will result in economic losses of RM209 billion.

READ MORE

No sign of Taman Rimba Kiara construction

PETALING JAYA (May 24): The construction of a sales gallery on the much talked about development on Taman Rimba Kiara at Taman Tun Dr Ismail (TTDI) has not begun since the land was cleared a few months ago.

READ MORE

新闻:你家的设计和建造,有将优质管理纳入考量吗?

对许多马来西亚人来说,拥有自己的房子是人生目标之一。但如今,仅仅拥有房子已经不能满足他们的需求,特别是分层房产的业主们。他们现在更加重视的是那些拥有管理完善,且能够提供长远增值潜能的房子。 在2018年5月12日举办的EdgeProp.

READ MORE