AG: River of Life’s river cleaning programme a mess

KUALA LUMPUR (August 6): Audit of the river water quality control projects under the River of Life (ROL) river cleaning programme has uncovered 13 Extension Of Time (EOT) applications being approved between 45 and 356 days, said the Auditor-General’s (AG) Report 2017 Series 1.

READ MORE

Plans for a new LCCT in Penang, says Guan Eng

KUALA LUMPUR (Aug 6): The government is looking to build a low-cost carrier terminal (LCCT) next to the Penang International Airport (PIA) in Bayan Lepas in one to two years, to cope with the increasing number of air passengers to the state.

READ MORE

Sarawak schools to be connected to grid

SIBU (August 6): The Education Ministry has agreed to connect Sarawak schools that were previously powered by generator sets to the grid system, setting aside an allocation of RM400 million, and adding RM35.

READ MORE

Protest calls for PIL 1 to be scrapped

GEORGE TOWN (August 6): In a peaceful protest held outside the state legislative assembly today, residents’ associations and Penang Forum members called for the cancellation of the Pan Island Link 1 (PIL 1), and review of the Penang Transport Master Plan (PTMP).

READ MORE

Proposed one-way loop for Klang

PETALING JAYA (August 6): A proposed traffic realignment involving a section of Jalan Tengku Kelana in Klang being turned into a one-way loop requires assessment of access roads of surrounding buildings and impact on traffic at intersections, says Klang Municipal Council (MPK) Selangor Palace representative Datuk Abdul Ghani Pateh Akhir.

READ MORE

Azmin to issue statement on KL-S'pore HSR

KUALA LUMPUR (Aug 6): Economic Affairs Minister Datuk Seri Mohamed Azmin Ali said his ministry will issue a statement at a later stage on details of the planned Kuala Lumpur-Singapore High Speed Rail (HSR).

READ MORE